Central Alberta

400mm x 150mm Hot Tap 

N.S. Pawliuk completed a 400mm x 150mm hot tap on steel sludge pipe during the 2025 construction season.

IMG_0703-preview.HEIC

Access Considerations

  • These hot taps were performed in a waste water treatment facility

  • N.S. Pawliuk workers are trained in all common industrial  hazards, required as part of access to this site. 

  • Low-clearance and lightweight equipment was used to allow for the hot taps to be completed on a job site with limited space, difficult entry and no hydraulic power source.

Key Points

  • This hot tap was performed with no disruption of service to the hot tapped pipe. 

  • This hot tap was performed within a water treatment processing facility. 

  • As with all hot taps, the tapping assembly and valve were pressure tested to ensure no leaks would have occurred once the cutter penetrated the pipe.